Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Andrew Whale shearing shed 1_gallery

Our client, a vet and sheep farmer, needed a shearing shed and yard cover designed for efficiency and innovation. Partnering with our team, he collaborated with fit-out providers to create two custom steel structures tailored to his farm’s needs. His farm is now equipped for better working conditions and long-term success.

View case study  

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Oritech combined office and warehouse 1_tile


Oritech combined office and warehouse

Oritech Pty Ltd partnered with us to build a modern office and warehouse facility in Mitchell Park, Victoria. The design featured innovative L-shaped tilt panels for both function and style. Using our Pro. building approach, we delivered a durable, cost-effective, high-quality solution. Seamless collaboration ensured the project was completed on time and within budget.

View case study

Avenel Primary School ball court cover

Project overview

Avenel Primary School approached us for the design and construction of a multi-purpose ball court cover that their students would be able to use in all weather conditions. The cover needed to be constructed over an existing ball court surface. Student safety when playing under the cover was a prominent consideration in the design.

Project value: 
  • $150K*
Building dimensions:
  • 30m x 22m x 3.8m
On-site build time:
  • 4 weeks
Project collaborators: 
  • Structural engineer
  • Third-party installer
Our scope and build details:
  • 3D structural model
  • Fabricated hot dipped galvanized steel package
  • Purlins and girts
  • Roof cladding
  • Guttering and downpipe system
Job site location:
  • Avenel, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs. 

Avenel Primary School ball court cover
Avenel Primary School recreational shed
Avenel Primary School playground cover
Avenel Primary School ball court cover
Avenel Primary School recreational shed
Avenel Primary School playground cover

Challenges and solutions

Installing the ball court cover provided a series of challenges due to the existing court and tight access around the court. Our installers needed to take special care to not damage the court surface while installing the ball court cover. Large trees stood around three sides of the court. The installers had to work around these obstacles without causing any damage to the trees.

Love what you see?

Get an obligation free quote today.