Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Scone Regional Livestock Selling Centre saleyard cover 1_gallery

The saleyards' alignment with the natural topography required a cover designed to match the levelling contours precisely. Also, maintaining uninterrupted saleyard operations was critical, so we developed a staged construction plan to complete the project efficiently without causing disruptions.

View case study

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Robyn Boyle combined indoor arena and stable complex 1_tile


Boyle indoor dressage arena and stable complex

Our client, a dedicated dressage rider and trainer in Scone, NSW, approached us for a combined indoor dressage arena and stable complex to prevent weather disruptions. Her vision focused on horse and rider safety with a shallow roof gradient to blend with her existing property infrastructure. The incorporation of a curved roofline was our solution to achieving an unobtrusive roof design.

View case study

Delamere Farm indoor jumping arena

Project overview

The indoor jumping arena had to be large enough to accommodate competition-level events while also providing an undercover area for the judges and spectators. The top priorities were cross ventilation and the safety of the rider and horse.

Project value: 
  • $300-350K*
Building dimensions:
  • 76m x 36m x 6m 
On-site build time:
  • 3 weeks
Project collaborations:
  • Fit-out specialist: Ciro Casa 
Our scope and build details:
  • Structural steel drawings, engineering certification and computations.
  • Structural concrete engineering including raft slab design for office.
  • 3D structural/shop steel drawings.
  • Fabricated hot dipped galvanised steel package.
  • Purlins and girts
Job site location: 
  • Stanhope, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs. 

Delamere Farm indoor jumping arena
Delamere Farm horse jumping arena
Delamere Farm indoor jumping arena drawings

Challenges and solutions

A 36m clearspan open web truss design was adopted to achieve the large clearspan requirement, and an end wall was included on the prevailing weather end to protect it from the elements and provide steel infrastructure to support large mirror mounts. The roof length was also extended to allow an elevated spectator stand to be incorporated.

A top cladding apron on the three open sides was added to the design to keep out rain and sunlight. This allows our client more time in the saddle no matter the weather and helps protect the riding surface.

Delamere farm 02

Love what you see?

Get an obligation free quote today.