Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Scone Regional Livestock Selling Centre saleyard cover 1_gallery

The saleyards' alignment with the natural topography required a cover designed to match the levelling contours precisely. Also, maintaining uninterrupted saleyard operations was critical, so we developed a staged construction plan to complete the project efficiently without causing disruptions.

View case study

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Robyn Boyle combined indoor arena and stable complex 1_tile


Boyle indoor dressage arena and stable complex

Our client, a dedicated dressage rider and trainer in Scone, NSW, approached us for a combined indoor dressage arena and stable complex to prevent weather disruptions. Her vision focused on horse and rider safety with a shallow roof gradient to blend with her existing property infrastructure. The incorporation of a curved roofline was our solution to achieving an unobtrusive roof design.

View case study

Geelong Council bulk storage shed 

Project overview

Geelong Council presented a project tender for a new bulk storage shed at their composting facility located in Anakie. MKM Constructions approached us to provide the steelwork package for them to present to the tender.

Project value: 
  • $223K*
Building dimensions:
  • 41m x 40m x 8.75m
Project collaborators: 
  • Civil engineer
  • MKM Constructions
  • Geotechnical engineer
  • Geelong Council
Our scope and build details:
  • 3D structural model.
  • Fabricated hot-dipped galvanised. steel package.
  • Purlins and girts.
  • Roof and wall cladding.
  • Guttering and downpipe
Job site location:
  • Anakie, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs. 

Geelong Council bulk storage shed
Geelong Council industrial building
Geelong Council industrial building
Geelong Council bulk storage building
Geelong Council industrial storage facility
Geelong Council industrial storage shed

Challenges and solutions

We designed and value-engineered the building to comply with the required composting loads. Engineering for the building needed to consider the concrete dado panel wall and withstand the weight of compost material. 

The shed needed to have adequate access to the outdoors to allow large machinery to load and unload composting material and pass through the building easily. 

“They were very professional in the pre-construction and planning phase which was vital given the site hard stand is constructed with a 2-degree slope and a challenging subsurface i.e. lots of rock! The site is also very exposed so during the actual assembly and elevation of the structure it was good to have such an experienced team working on the job. It was amazing watching it go up as one complete structure with multiple cranes used – an impressive display of teamwork and coordination!”
Andrew Lucas
Geelong Council

Love what you see?

Get an obligation free quote today.