With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Inverell Livestock Exchange saleyard cover 1_gallery

In 2012, RLX purchased the livestock venue and began upgrading it for better animal welfare and safer conditions. They engaged us to design and install a custom yard cover. Our collaboration ensured it complemented existing infrastructure while managing stormwater effectively.

View case study

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Keysborough Powercor industrial depot 4_tile


Keysborough Powercor industrial depot

In collaboration with Powercor and B2B Project and Construction Management, we optimised cladding and parapet heights for a cost-effective solution. Our value engineering minimised unnecessary elements, enhancing functionality with vehicle storage in the rear and office space in the front, featuring unique cladding for branding. Read more about the project's details.

View case study

One School Global clubroom

Project overview

OneSchool Global Melton campus is Victoria’s largest site, housed in a state-of-the-art facility at the heart of High Street, Melton. The school has learning spaces for both primary and secondary students. 

Project value: 
  • $950K* 
Building dimensions:
  • Approximate total area 2,575m2 
On-site build time:
  • 18 weeks
Project collaborators: 
  • Structure Solutions
  • MKM Constructions
  • Bill Jacobs Pty Ltd 
  • Hardrock Geotechnical
Our scope and build details:
  • Structural concrete engineering.  
  • 3D structural model. 
  • Fabricated hot dipped galvanised steel package. 
  • Hold down footing bolts. 
  • Purlins and girts.
  • Mezzanine floor including bearers and studs.
  • Lift void.
  • Cantilever verandas.
Job site location:
  • Melton, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs. 

OneSchool Global Melton Campus club rooms
OneSchool Global Melton Campus recreational clubroom
OneSchool Global Melton Campus clubroom shed

Challenges and solutions

It was a challenge to minimise the internal support posts that support the first-floor structure, hence large floor beams were introduced to overcome this.  

External clear span fascia trusses were integrated into the steelwork package to help brace the building and provide support and fixes for the many and varied size windows to allow plenty of natural light.  

Extra steelwork had to be designed in the clubrooms to accommodate the stage curtain and also basketball backboards. 