Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Inverell Livestock Exchange saleyard cover 1_gallery

In 2012, RLX purchased the livestock venue and began upgrading it for better animal welfare and safer conditions. They engaged us to design and install a custom yard cover. Our collaboration ensured it complemented existing infrastructure while managing stormwater effectively.

View case study

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Keysborough Powercor industrial depot 4_tile


Keysborough Powercor industrial depot

In collaboration with Powercor and B2B Project and Construction Management, we optimised cladding and parapet heights for a cost-effective solution. Our value engineering minimised unnecessary elements, enhancing functionality with vehicle storage in the rear and office space in the front, featuring unique cladding for branding. Read more about the project's details.

View case study

Bendigo Gliding Club aircraft hangar

Project overview

Bendigo Gliding Club is located in the regional suburb of Raywood. The club is a recreational gliding club that is growing steadily in members.  

Owners of the club contacted us for a hangar and after a successful project completion of that hangar, they returned for a second hangar. The two hangars stand side by side on the club’s airfield.  

Our client required the hangars to be designed for wide-spanned gliders and 3m high sliding doors to comfortably get gliders in and out of the hangar. They also wanted doors at both ends of the hangar without outriggers.  

On-site build time:
  • 6 weeks
Job site location:
  • Raywood
Project collaborators: 
  • Laker Group
  • Gliding club members
Our scope and build details:
  • Structural steel drawings, engineering certification and computations.
  • 3D structural model.
  • Fabricated hot dipped galvanised steel package.
  • Purlins and girts.
  • Roof and wall cladding. 
  • Guttering and downpipes. 
  • Sliding doors. 
  • Custom sliding door tracks. 
  • Personal access doors. 
  • Footings concrete. 
  • Building permit.  
Bendigo Gliding Club helicopter hangar
Bendigo Gliding Club aircraft shed
Bendigo Gliding Club aviation hangar
Bendigo Gliding Club airplane hangar
Bendigo Gliding Club aviation shelter
Bendigo Gliding Club aircraft club shed
Bendigo Gliding Club aircraft hangar

Challenges and solutions

Ensuring we designed the door system appropriately for our client’s needs required us to design the building with a triple-track door system with intermediate ground guides placed in positions to ensure they would remain unobstructed from our client’s rail system.  

 

“From the outset, Central Steel Build’s approach and ability to incorporate our design requirements, their attention to detail, helpfulness, and friendly attitude made the task of introducing two new glider hangars at Raywood a rewarding and painless exercise. Both buildings were manufactured and installed precisely on time and within budget. I’d have no hesitation recommending the company to anyone thinking of erecting a quality and superior structure for this purpose.”
Gerry Elliott
Bendigo Gliding Club

Love what you see?

Get an obligation free quote today.