Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Andrew Whale shearing shed 1_gallery

Our client, a vet and sheep farmer, needed a shearing shed and yard cover designed for efficiency and innovation. Partnering with our team, he collaborated with fit-out providers to create two custom steel structures tailored to his farm’s needs. His farm is now equipped for better working conditions and long-term success.

View case study  

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Oritech combined office and warehouse 1_tile


Oritech combined office and warehouse

Oritech Pty Ltd partnered with us to build a modern office and warehouse facility in Mitchell Park, Victoria. The design featured innovative L-shaped tilt panels for both function and style. Using our Pro. building approach, we delivered a durable, cost-effective, high-quality solution. Seamless collaboration ensured the project was completed on time and within budget.

View case study

Castle & Co multi-tenanted factories

Project overview

An investor approached us with a building layout for a new multi-tenant factory complex in East Bendigo, VIC. We liaised with him to come up with the most economical design to maximise his return on investment.

The factories needed to have concrete panel external and internal walls to comply with fire regulations. Our client specifically wanted us to focus on the roof in the initial design phases, trying different methods to come up with the best design.

Project value: 
  • $350K*
Building dimensions:
  • 24m x 84m x 7m
On-site build time:
  • 23 weeks
Project collaborators: 
  • Civil engineer
  • Third-party installer
  • Geotechnical engineer
  • Building designer
  • Precast panel supplier
Our scope and build details:
  • 3D structural model
  • Fabricated hot dipped galvanised steel package
  • Purlins and girts
  • Roof and wall cladding
  • Anticon blanket insulation and safety mesh
  • Concrete slab design and engineering
  • Concrete panel engineering
  • Box gutters
  • Roller shutter openings
  • Parapets
Job site location:
  • East Bendigo, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

Ian Castles multi-tenant factories
Industrial factory shed
Large industrial factory shed
Ian Castles multi-tenant factories
Industrial factory shed
Large industrial bulding factory

Challenges and solutions

We faced several challenges throughout the design process to value engineer and create a design that would gain maximum return on investment for our client. This included a lot of work on the unique roof design, to ensure the box guttering and drainage would be practical and economical.

Love what you see?

Get an obligation free quote today.