With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Andrew Whale shearing shed 1_gallery

Our client, a vet and sheep farmer, needed a shearing shed and yard cover designed for efficiency and innovation. Partnering with our team, he collaborated with fit-out providers to create two custom steel structures tailored to his farm’s needs. His farm is now equipped for better working conditions and long-term success.

View case study  

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Oritech combined office and warehouse 1_tile


Oritech combined office and warehouse

Oritech Pty Ltd partnered with us to build a modern office and warehouse facility in Mitchell Park, Victoria. The design featured innovative L-shaped tilt panels for both function and style. Using our Pro. building approach, we delivered a durable, cost-effective, high-quality solution. Seamless collaboration ensured the project was completed on time and within budget.

View case study

Corowa Saleyards cover

Project overview

MKM Constructions contacted us to act as the steel package designer and fabricator in the Corowa Saleyards project. We needed to look at the original design and plans to determine construction savings opportunities.

Close collaboration with MKM Constructions was required to ensure the design would accommodate the fall of the land and the working saleyards beneath.

Project value: 
  • $1.3M*
Building dimensions:
  • 180m x 150m
On-site build time:
  • 24 weeks
Project collaborators: 
  • MKM Constructions
  • Civil engineer
  • Geotechnical engineer
  • Site feature surveyor
Our scope and build details:
  • 3D structural model
  • Fabricated hot dipped galvanised steel package
  • Purlins and girts
  • Eave overhangs
  • Solar panel loadings
  • Structural engineering drawings, certificates, and computations
Job site location:
  • Corowa, New South Wales

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs. 

Corowa Saleyards cover
Corowa Saleyards
Corowa Saleyards industrial cover
Corowa Saleyards cover
Corowa Saleyards industrial cover
Corowa Saleyards

Challenges and solutions

We worked closely with MKM Constructions to ensure the project was designed in the most economical way possible. The project demanded acute attention to detail throughout the design process to ensure the steel package was value engineered and catered to the existing yard fit-out and use of space. Certain areas of the saleyards cover needed to be free from columns to work in practically with the existing yard design. Clearance heights needed to be observed and site level requirements also needed to be catered for.

“Thanks to Central Steel Build and MKM for the successful completion of the 22,700m2 roof over the Corowa Saleyards. A credit to both MKM and CSB for their systems and workmanship to achieve this great result.”
Robert Bon
Corowa Saleyards, Project Manager Consultant

Love what you see?

Get an obligation free quote today.