With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Inverell Livestock Exchange saleyard cover 1_gallery

In 2012, RLX purchased the livestock venue and began upgrading it for better animal welfare and safer conditions. They engaged us to design and install a custom yard cover. Our collaboration ensured it complemented existing infrastructure while managing stormwater effectively.

View case study

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Keysborough Powercor industrial depot 4_tile


Keysborough Powercor industrial depot

In collaboration with Powercor and B2B Project and Construction Management, we optimised cladding and parapet heights for a cost-effective solution. Our value engineering minimised unnecessary elements, enhancing functionality with vehicle storage in the rear and office space in the front, featuring unique cladding for branding. Read more about the project's details.

View case study

Corowa Saleyards cover

Project overview

MKM Constructions contacted us to act as the steel package designer and fabricator in the Corowa Saleyards project. We needed to look at the original design and plans to determine construction savings opportunities.

Close collaboration with MKM Constructions was required to ensure the design would accommodate the fall of the land and the working saleyards beneath.

Project value: 
  • $1.3M*
Building dimensions:
  • 180m x 150m
On-site build time:
  • 24 weeks
Project collaborators: 
  • MKM Constructions
  • Civil engineer
  • Geotechnical engineer
  • Site feature surveyor
Our scope and build details:
  • 3D structural model
  • Fabricated hot dipped galvanised steel package
  • Purlins and girts
  • Eave overhangs
  • Solar panel loadings
  • Structural engineering drawings, certificates, and computations
Job site location:
  • Corowa, New South Wales

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs. 

Corowa Saleyards cover
Corowa Saleyards
Corowa Saleyards industrial cover
Corowa Saleyards cover
Corowa Saleyards industrial cover
Corowa Saleyards

Challenges and solutions

We worked closely with MKM Constructions to ensure the project was designed in the most economical way possible. The project demanded acute attention to detail throughout the design process to ensure the steel package was value engineered and catered to the existing yard fit-out and use of space. Certain areas of the saleyards cover needed to be free from columns to work in practically with the existing yard design. Clearance heights needed to be observed and site level requirements also needed to be catered for.

“Thanks to Central Steel Build and MKM for the successful completion of the 22,700m2 roof over the Corowa Saleyards. A credit to both MKM and CSB for their systems and workmanship to achieve this great result.”
Robert Bon
Corowa Saleyards, Project Manager Consultant

Love what you see?