Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Andrew Whale shearing shed 1_gallery

Our client, a vet and sheep farmer, needed a shearing shed and yard cover designed for efficiency and innovation. Partnering with our team, he collaborated with fit-out providers to create two custom steel structures tailored to his farm’s needs. His farm is now equipped for better working conditions and long-term success.

View case study  

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Oritech combined office and warehouse 1_tile


Oritech combined office and warehouse

Oritech Pty Ltd partnered with us to build a modern office and warehouse facility in Mitchell Park, Victoria. The design featured innovative L-shaped tilt panels for both function and style. Using our Pro. building approach, we delivered a durable, cost-effective, high-quality solution. Seamless collaboration ensured the project was completed on time and within budget.

View case study

Dysons combined office and logistics depot

Project overview

Dyson Group is a family-owned and operated bus company that has been in business since 1952 and is now one of Victoria’s largest bus companies.  

They engaged Dzine Group as a commercial builder over the project of their new premises. Dzine Group then engaged us to fabricate the steelwork for the project build. 

Project value: 
  • $500K*
Building dimensions:
  • 32m x 22m x 7.2m
On-site build time:
  • 10 weeks
Project collaborators: 
  • Structplan
  • Dzine Group
Our scope and build details:
  • 3D structural model.
  • Fabricated hot-dipped galvanised steel package.
  • Purlins and girts.
  • Personal access doors.  
  • Skylights.  
  • Guttering and rainwater system.  
  • 5kPa mezzanine.  
  • 6m cantilever canopy.  
  • Roof insulation.    
Job site location:
  • Kyneton, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs. 

Dyson Group combined office and logistics depot
Dyson Group office and logistics depot
Dyson Group commercial complex
Dyson Group logistics depot
Dyson Group logistics depot shed
Dyson Group combined office and logistics space
Dyson Group combined office and logistics depot

Challenges and solutions

The job was pre-engineered, so we really didn’t have anything to do with the design. The challenge was to provide a timely solution for the kit and coordinate the installation effectively.  

“I wouldn’t hesitate in recommending Central Steel Build again because I’m so pleased with the end result and the product.”
Rick Seymour
Manager at Kyneton Dyson Group branch

Love what you see?

Get an obligation free quote today.