Skip to the main content.

Request a quote

Request a quote

Dysons combined office and logistics depot

Project overview

Dyson Group is a family-owned and operated bus company that has been in business since 1952 and is now one of Victoria’s largest bus companies.  

They engaged Dzine Group as a commercial builder over the project of their new premises. Dzine Group then engaged us to fabricate the steelwork for the project build. 

Project value: 
  • $500K*
Building dimensions:
  • 32m x 22m x 7.2m
On-site build time:
  • 10 weeks
Project collaborators: 
  • Structplan
  • Dzine Group
Our scope and build details:
  • 3D structural model.
  • Fabricated hot-dipped galvanised steel package.
  • Purlins and girts.
  • Personal access doors.  
  • Skylights.  
  • Guttering and rainwater system.  
  • 5kPa mezzanine.  
  • 6m cantilever canopy.  
  • Roof insulation.    
Job site location:
  • Kyneton, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs. 

Challenges and solutions

The job was pre-engineered, so we really didn’t have anything to do with the design. The challenge was to provide a timely solution for the kit and coordinate the installation effectively.  

“I wouldn’t hesitate in recommending Central Steel Build again because I’m so pleased with the end result and the product.”
Rick Seymour
Manager at Kyneton Dyson Group branch

Love what you see?

Get an obligation free quote today.