Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Scone Regional Livestock Selling Centre saleyard cover 1_gallery

The saleyards' alignment with the natural topography required a cover designed to match the levelling contours precisely. Also, maintaining uninterrupted saleyard operations was critical, so we developed a staged construction plan to complete the project efficiently without causing disruptions.

View case study

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Robyn Boyle combined indoor arena and stable complex 1_tile


Boyle indoor dressage arena and stable complex

Our client, a dedicated dressage rider and trainer in Scone, NSW, approached us for a combined indoor dressage arena and stable complex to prevent weather disruptions. Her vision focused on horse and rider safety with a shallow roof gradient to blend with her existing property infrastructure. The incorporation of a curved roofline was our solution to achieving an unobtrusive roof design.

View case study

Leopold Swim School clubroom

Project overview

Leopold swimming school needed an upgraded competition-sized pool to service its ever-expanding customer base. The requirements were to fit a 25m x 6m pool and pool cover beside the existing facility within the space available.

A pump shed needed to be incorporated into the design and the new build needed to blend into the existing structure.

Project value: 
  • $120K*
Building dimensions:
  • 28m x 10m x 3.3m
Project collaborators: 
  • Civil engineer
  • MKM Constructions 
Our scope and build details:
  • 3D structural model.
  • Fabricated hot-dipped galvanised steel package.
  • HDG roof purlins.
  • Skillion roof design.
  • Guttering and downpipes.
  • Eave overhang.
  • Foundation design.
Job site location:
  • Leopold, Victoria

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs. 

Leopold Swim School clubrooms
Leopold Swim School recreational facility
Leopold Swim School recreational shed clubroom

Challenges and solutions

A fully hot-dipped galvanised frame was adopted to ensure longevity within a potentially corrosive environment and the roof purlins were upgraded to heavy-duty RHS, allowing insulated roof panels to be used. The foundations also needed to be designed to accommodate the pool depth to ensure structural stability.

Love what you see?

Get an obligation free quote today.