Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Andrew Whale shearing shed 1_gallery

Our client, a vet and sheep farmer, needed a shearing shed and yard cover designed for efficiency and innovation. Partnering with our team, he collaborated with fit-out providers to create two custom steel structures tailored to his farm’s needs. His farm is now equipped for better working conditions and long-term success.

View case study  

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Oritech combined office and warehouse 1_tile


Oritech combined office and warehouse

Oritech Pty Ltd partnered with us to build a modern office and warehouse facility in Mitchell Park, Victoria. The design featured innovative L-shaped tilt panels for both function and style. Using our Pro. building approach, we delivered a durable, cost-effective, high-quality solution. Seamless collaboration ensured the project was completed on time and within budget.

View case study

Tig Lungerhausen combined indoor arena and stable complex

Project overview

Wanting to improve her equestrian property in the Southern Highlands district of NSW, our client was seeking an indoor dressage arena and separate stable complex designed and constructed with Central Steel Build.

They requested that we base the stable design on an existing plan. We designed the stables with 100mm x 100mm SHS columns to accommodate the internal stable fit-out.

Project value: 
  • $400K*
Building dimensions:
  • Indoor dressage arena: 64m x 21m x 5m
  • Stable complex: 18m x 21m x 3m
On-site build time:
  • 4 weeks
Project collaborators: 
  • Structural engineer
  • Third-party engineer 
Our scope and build details:
  • 3D structural model
  • Fabricated hot dipped galvanised steel package
  • Purlins and girts
  • Skylights
  • Roof and wall cladding
  • Guttering and downpipe system
  • Custom openings in stable complex
  • Raised cladding in stable complex
  • Eave overhang along sides of the indoor dressage arena
  • Equinarail kickrail system
Job site location:
  • Exeter, New South Wales

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.  

Tig Lungerhausen indoor dressage arena and stable complex
Tig Lungerhausen stable complex
Tig Lungerhausen stable complex and horse arena
Tig Lungerhausen indoor dressage arena
Tig Lungerhausen indoor dressage arena
Tig Lungerhausen indoor dressage arena and kickrail system
Tig Lungerhausen stable complex
Tig Lungerhausen stable complex
Tig Lungerhausen stable complex

Challenges and solutions

There were no specific challenges in this project as the project team, in collaboration with all stakeholders, effectively worked together. This resulted in a smooth construction process, meeting our client’s requirements, and delivering a high standard of quality.

Love what you see?

Get an obligation free quote today.