Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Andrew Whale shearing shed 1_gallery

Our client, a vet and sheep farmer, needed a shearing shed and yard cover designed for efficiency and innovation. Partnering with our team, he collaborated with fit-out providers to create two custom steel structures tailored to his farm’s needs. His farm is now equipped for better working conditions and long-term success.

View case study  

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Oritech combined office and warehouse 1_tile


Oritech combined office and warehouse

Oritech Pty Ltd partnered with us to build a modern office and warehouse facility in Mitchell Park, Victoria. The design featured innovative L-shaped tilt panels for both function and style. Using our Pro. building approach, we delivered a durable, cost-effective, high-quality solution. Seamless collaboration ensured the project was completed on time and within budget.

View case study

National Make Good Solutions industrial warehouse

Project overview

Leader, Australia's top computer manufacturer, sought to upgrade their outdated manufacturing, warehouse, and office premises in Clayton South, Victoria. They aimed to modernise their facilities by demolishing the warehouse while retaining the office structure and constructing a new warehouse with additional clearance for enhanced vertical storage. 

National Make Good Solutions (NMGS) was engaged by Leader to oversee the project and find a suitable supplier to design and fabricate a customised steelwork package. 

Central Steel Build used advanced technology to assess and take 3D scans of the site to ensure their design fitted seamlessly with existing infrastructure. This enabled precise cost estimation, value engineering, and tailored design, ensuring Leader’s build was within budget. This allowed NMGS to focus on other aspects of the project, confident Central Steel Build had the expertise, industry knowledge, and skilled team to deliver on their promise. 

Building dimensions:
  • 75m x 30m x 10m 
On-site build time:
  • 10 weeks
Project collaborators: 
  • Civil engineer 
  • National Make Good Solutions
  • Third-party installer

Job site location:

  • Clayton South, Victoria
Our scope and build details:
  • 3D structural model
  • Fabricated hot dipped galvanised steel package
  • Purlins and girts
  • Roof and wall cladding
  • Wonderglas skylights
  • Personal access doors
  • 55mm blanket and roof safety mesh
  • Box gutter
  • Roller shutter openings
  • Site scan

 
Leader industrial warehouse
Leader industrial building
Leader industrial structure facility
Leader industrial warehouse
Leader industrial building
Leader industrial warehouse facility

Challenges and impact

Central Steel Build's expertise in value engineering proved instrumental in overcoming various structural and design challenges while minimising expenses. By strategically dividing the warehouse into two gables interconnected by a box gutter, capitalising on existing column placements, and utilising the existing warehouse slab and footings in the design, the team were able to significantly reduce construction costs without compromising functionality. Moreover, meticulous attention was given to maintaining uniform clearance heights of 10 meters throughout the facility, facilitating optimal forklift access and storage capacity. Their innovative design incorporated existing warehouse features, such as doors and safety bollard systems, while ensuring compatibility with the existing office structure. 

Despite the inherent complexities of the project, Central Steel Build's project delivery team demonstrated remarkable agility and professionalism in overcoming challenges such as tight site access and coordination with existing infrastructure. Through collaborative teamwork and unwavering dedication, they ensured the successful execution of the project, delivering a state-of-the-art facility that met Leader's exacting standards and minimised disruption to Leader's business operations.  

Central Steel Build's partnership on this project exemplified the Pro. design build advantage and a commitment to delivering innovative, cost-effective solutions tailored to meet the unique needs of their clients. 

Love what you see?

Get an obligation free quote today.