Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Scone Regional Livestock Selling Centre saleyard cover 1_gallery

The saleyards' alignment with the natural topography required a cover designed to match the levelling contours precisely. Also, maintaining uninterrupted saleyard operations was critical, so we developed a staged construction plan to complete the project efficiently without causing disruptions.

View case study

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Robyn Boyle combined indoor arena and stable complex 1_tile


Boyle indoor dressage arena and stable complex

Our client, a dedicated dressage rider and trainer in Scone, NSW, approached us for a combined indoor dressage arena and stable complex to prevent weather disruptions. Her vision focused on horse and rider safety with a shallow roof gradient to blend with her existing property infrastructure. The incorporation of a curved roofline was our solution to achieving an unobtrusive roof design.

View case study

Oritech combined office and warehouse

Project overview

Oritech, a family-owned Australian electrical company based in Mitchell Park, Victoria, provides electronics manufacturing services across various industries nationwide. As the business expanded, Oritech needed a new combined office and warehouse facility. They turned to MKM Constructions to design and manage the project, who, in turn, reached out to us at Central Steel Build for our expertise in commercial building solutions.

With our experience in delivering high-quality, cost-effective structures, we worked closely with MKM Constructions to develop the most practical approach for constructing the new facility. The design featured innovative L-shaped tilt panels, which we designed to create a sleek, modern façade at the front of the office. These panels were arranged to resemble fins, adding both functionality and visual appeal to the building’s exterior.

At Central Steel Build, we pride ourselves on our ability to deliver tailored solutions that meet the unique needs of our clients. For Oritech, this meant providing a strong, durable building with a distinctive design that reflected the company’s innovative approach to the industry.

Project value: 
  • $220K*
Building dimensions:
  • 40m x 24m x 7.35m 
On-site build time:
  • 8 weeks

Project collaborators: 

  • MKM Constructions
  • Civil engineer
  • Geotechnical engineer

Job site location:

  • Mitchell Park, Victoria
Our scope and build details:
  • 3D structural model
  • Fabricated hot dipped galvanised steel package
  • Purlins and girts
  • Blanket insulation
  • Roof safety mesh
  • Roller door openings
  • Canopy
  • Parapet
  • Decorative fins
  • Box gutter
  • Dado panels
  • Colourbond cladding
  • Toe flashings
  • Glazing beams
  • Personal access doors

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs. 

Oritech combined office and warehouse
Oritech combined office and warehouse
Oritech combined office and warehouse
Oritech combined office and warehouse
Oritech combined office and warehouse
Oritech combined office and warehouse 14_tile

Project success and impact:

The project was a resounding success, thanks to Central Steel Build's expert value-engineering and structural design. We worked closely with the architectural team to ensure the building aligned perfectly with the brief, delivering a structure that met both aesthetic and functional requirements.

Throughout the installation process, everything proceeded smoothly, facilitated by the effective implementation of our Pro. approach, which fosters seamless collaboration between external partners, our project manager, and our internal team. This unified approach allowed for efficient communication and swift decision-making, ensuring every detail was addressed promptly.

The result? A project that was completed on time, on budget, and to the high standards expected by all stakeholders. The cohesive teamwork from all parties involved was key to the flawless execution, further solidifying Central Steel Build’s reputation for delivering exceptional, tailored building solutions.

Love what you see?

Get an obligation free quote today.