Skip to the main content.
Request a quote
Request a quote
Capability Statement

Capability Statement_website image

With a solution-focused approach, we collaborate closely with clients and consultant teams to align on scope, time frames, design objectives, and cost. We’re committed to delivering a strong return on your investment. Are you interested in our work in the commercial and industrial sectors?

Download our Capability Statement

Feature case study

Andrew Whale shearing shed 1_gallery

Our client, a vet and sheep farmer, needed a shearing shed and yard cover designed for efficiency and innovation. Partnering with our team, he collaborated with fit-out providers to create two custom steel structures tailored to his farm’s needs. His farm is now equipped for better working conditions and long-term success.

View case study  

Feature article
Andrew Whale shearing shed 1_tile


Providing Industry-Leading Steel Building Solutions 

Central Steel Build, committed to innovation, quality, and customer satisfaction, has solidified its reputation as an industry leader. We're revolutionising agricultural structures, and transforming how farmers and producers approach building solutions. If you’re interested in our work in the agricultural sector, read the article to discover how we’re transforming building solutions.

Read more

Latest case study
Oritech combined office and warehouse 1_tile


Oritech combined office and warehouse

Oritech Pty Ltd partnered with us to build a modern office and warehouse facility in Mitchell Park, Victoria. The design featured innovative L-shaped tilt panels for both function and style. Using our Pro. building approach, we delivered a durable, cost-effective, high-quality solution. Seamless collaboration ensured the project was completed on time and within budget.

View case study

Westlab combined office and warehouse

Project overview

Westlab is a fast-growing company that required a large clear-span warehouse to accommodate long-span racking as well as large office space for future growth, including staff break-out and creative areas. They also required an undercover receiving and dispatch area on the building's east side. The structure had to be built to last in harsh environments.

Project value: 
  • $400-500K*
On-site build time: 
  • 5 weeks
Job site location: 
  • Mitchell Park, Victoria
Project collaborators:
  • Project Now 
  • MKM Constructions 
Our scope and build details:
  • Structural steel drawings, engineering certification and computations.
  • Structural concrete engineering including raft slab design for office and precast panels.
  • 3D structural/shop steel drawings.
  • Fabricated hot dipped galvanised steel package.
  • Purlins and girts.
  • Office steelwork.
  • Cantilever canopy.
  • Personal access doors.
  • Sisalation and mesh on the roof.
  • Roof and wall cladding.

*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs. 

Westlab office and warehouse
Westlab commercial complex facility
Westlab office and warehouse drawings

Challenges and solutions

Working closely with MKM Constructions, we designed an economical solution for the office, ensuring suitable breakout areas and creative space, as well as a modern glazed office front with hidden rooflines. The large cantilever canopy was selected to be mounted off the reinforced east side of the main warehouse to accommodate inwards and outwards goods movement.

Our classic clear-span truss design was the obvious choice to provide unobstructed warehouse space. Our engineers provided a solution for 2.8m high horizontal clip-on precast panels that rely on the portal frame for support to guarantee hardwearing areas of the building are still workable in fifty years.