Project overview
Yulong Stud originally approached us to design and build them a large stable complex to be used for yearlings and their mothers. However, after initial discussions, they decided to deal with us through a third-party stable fit-out provider to make the project less complicated to manage.
We collaborated closely to ensure the overall building design would work with the stable fit-out.
- $450K*
- 59m x 45m x 6m
- 8 weeks
- Structural engineer
- Third-party installer
- Stable fit-out provider
- 3D structural model
- Fabricated hot dipped galvanised steel package
- Purlins and girts
- Roof and wall cladding
- Lean-to on each side
- Sliding door opening
- Roof eaves
- Roof sisalation
- Shutters and openings
- Mangalore, Victoria
*All prices are an indication only and are subject to change at any time due to steel prices. Prices also do not include site preparation or installation costs.
Challenges and solutions
The overall design of our building, including the placement of columns, required a considerable amount of attention and liaising with the stable providers to ensure the stable could be fitted out easily post-construction, including the retrofitting of stable shutter windows.